Can you reduce the delivery time of the camloc products?

  • English
  • Français
  • Nederlands
  • Español
  • Deutsch
  • Português
1) for camloc quarter turns, latches and keenserts We can only guarantee AOG service when parts are in stock.  The production lead time can be reduced, however this is only verified the moment the order is booked into the system. Then we can verify if piece parts are available or if they need to be ordered from sub-suppliers.  Also work planning for assembly, machine availability need to be verified.  A stamping machine cannot simply be stopped for a rapid production, it would have us loose the economics of scale.  Then there is also the plating that is subcontracted, that burns another 2 weeks in the delivery time. Typically the total delivery time as quoted can be reduced for some of the components with an extra 2 weeks.  Expecting more is requesting miracles to happen.  Unfortunately I cannot propose even a premium price to get parts sooner Take care, some components will have difficulty to be reduced in delivery time, since they have not yet been manufactured before.  This means that engineering drawings need to be made which burns also time.   I sincerely hope you understand our situation.   2) camloc gas springs Cost is not the issue we manufacture upon receipt of order and this is dependent on material availability, rod stock and component stock.  It is possible we can better this lead time to around 10-14 days but lead times change daily as purchase orders come in. Please note that Christmass is coming soon, which means that the last 2 weeks of the year will also be lost as production time.
Tags: 

 

Camloc is a registered brand name from